Supporting Documentation · Jan 6, 2026
7-26 - RFP RFI Consultant Response.pdf
66d2eaa18850e14491965f6ad6c0c07d8cf458ad70e5c9a423646058c9734a7fIndexed text · page 63
Show all pagesLuddington Road Sidewalk Panel Replacement Similar Project Experience Greenman-Pedersen's broad-based engineering experience spans a range of multifaceted construction projects and diverse public works. Greenman-Pedersen has completed numerous municipal and county bridge and roadway projects, including scoping, feasibility studies, bridge/culvert replacement and rehabilitation projects, roadway reconstruction and realignment projects. Our expertise in designing and planning projects spans roadway and drainage improvement projects, as well as large-scale bridge rehabilitation and reconstruction. Similar Project Design Experience Rehabilitation of the Caldwell Place Culvert, Private Driveway over Tributary to Rahway River, Township of Springfield, Union County, NJ 2018-2020. Construction Cost $516K The project included a field inspection, condition evaluation, and rehabilitation of the existing culvert, which consisted of a cast-in-place concrete slab superstructure supported on concrete abutments. The initial phase of work consisted of a field inspection of the culvert to assess its existing condition and evaluate rehabilitation options. Following the inspection, preliminary and final designs were performed for the replacement of the existing superstructure with reinforced concrete voided slab beams and the isolated repair of the substructure concrete. The project also included the preparation of construction staging plans, part-time construction inspections, and extensive coordination with adjacent businesses throughout the construction period. Client: Springfield Township, Michael Disko, Director of Engineering, 973-912-2219 Railroad Avenue / Main Street Stormwater Improvements Project, Califon Borough, Hunterdon County, NJ 2013-2014. Construction Cost $147K Proposed improvements included replacement of the existing antiquated stormwater piping and open channel system, design of a stormwater conveyance relief pipe and precast diversion chambers, and replacement of County Structure J-8 with a precast structure. The project included the final design and preparation of contract documents, as well as extensive coordination with State and Federal Agencies, including the preparation of a Categorical Exclusion Document (CED). The project also included processing requests for reimbursement from State and Federal agencies. Client: Califon Borough, Charles
, including the preparation of a Categorical Exclusion Document (CED). The project also included processing requests for reimbursement from State and Federal agencies. Client: Califon Borough, Charles Daniel, Mayor, cdaniel@califonboro.net Replacement of County Bridge No. E0203, Orchard Road over Tributary to Bedens Brook, Township of Montgomery, Somerset County, NJ 2016-2018. Construction Cost $748K The project consisted of the replacement of a 5’ single-span steel multi-stringer and masonry jack arch supported on masonry abutments. The project included the preliminary and final design of the replacement structure, consisting of a prefabricated concrete 4-sided box culvert and cast-in-place concrete wingwalls with stone veneer. The project also included the preparation of NJDEP Permit applications, Soil Conservation District approval, easement acquisition, detour plans, and extensive coordination with utility companies for utility accommodations. Client: Somerset County, Brian Maurer, P.E., Supervisor of Bridges, 908-231-7024 Page | 6
File revisions (1)
- Sep 29, 2026
66d2eaa1885017,247,724 bytes