Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 6, 2026

7-26 - RFP RFI Consultant Response.pdf

Preserved file SHA-25666d2eaa18850e14491965f6ad6c0c07d8cf458ad70e5c9a423646058c9734a7f

Indexed text · page 9

Show all pages
Page 9

TOWNSHIP OF WEST ORANGE 25 LAKESIDE AVENUE, WEST ORANGE, N.J. 07052 DEPARTMENT OF ENGINEERING SUSAN McCARTNEY Tel/Fax: (973) 325-4160 Mayor Email: Engineering@westorange.org ZAYIBETH CARBALLO Director/Municipal Engineer REQUEST FOR INFORMATION NO. 1 TO: To All Prospective Consultants FROM: Zayibeth Carballo, Director of Engineering/Municipal Engineer PROJECT: Luddington Road – Sidewalk Panel Replacement DATE: November 20, 2025 Additional information regarding the existing culvert and sewer system was requested. Question: “Is there any culvert information that can be provided, even the Township storm sewer mapping of area will be helpful”. ➢ Response: The enclosed maps and drawings are being provided for your reference. Drawing 1. Alternate Outlet Tunnels Thru First Mountain Drawing 2. Record of Ramp Portal at Easterly Entrance of Luddington Rd. Tunnel Drawing 3. Details of Ramp Portal at East Entrance to Luddington Rd. Tunnel, 10/12/31 Drawing 4. Details of Ramp Portal at East Entrance to Luddington Rd. Tunnel, 10/31/31 Also, see link to the Township’s Stormwater Information page on our website: Link: https://www.westorange.org/1862/Stormwater-Information Please be advised that the deadline for submitting proposals has been changed from December 1st, 2025 to Friday, December 5th, 2025 on or before 10AM. ZYC/tb AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org

File revisions (1)