Packet · Nov 12, 2024
Township Council Meeting — Packet
7a1def62c31c151b6c4bb4838998e5f15a5f59d5e0238037444733552be335adIndexed text · page 17
Show all pagesConditions of Installation RE: Installations of equipment are subject to the following conditions and/or exclusions. Unless otherwise specifically included in the accompanying quote, Ben Shaffer Recreation and its contracted installers are not responsible for the following. If non-included services are needed, additional charges will apply and be billed at the contract cost: « — Unforeseen obstructions (such as in sub-surface) resulting in delayed installation or additional removal fees (rock, pipes, old building or site debris, hidden borders, oversized footings or other items that may be discovered during the excavation and removal process) Accepting delivery and/or checking maierials Storage/security of materials at jobsite Relocation or transport of materials to jobsite Site preparation (grading, drainage, etc.) Finish work to site area (borders, protective surfacing) Removal/ Disposal of existing equipment Off-site disposal of shipping materials (cardboard, crating, ete.). Shipping materials will be neatly stacked on site, or placed in an on-site dumpster provided by site owner/manager. Equipment not included as part of original project number Any permits or clearance by utility companies and/or local building departments if applicable » Site security for rubber safety surface installation provided by others. ¢ — Ifthere are no on-site provisions for disposition of excavated footing materials (i.e. soil, blacktop, rocks, etc.) NOTE: You should contact your utility companies directly to clear the area for all utilities prior to ordering equipment. Any necessary changes in equipment or layout can then be done prior to start of construction, You must indicate that the mark-out is for survey only. Customer is responsible for locating any privately owned! utilities. We cannot be responsible for any damage to | water, gas or other utilities as a result of owner's failure to clear underground plans. If finish work is being done by installer (borders, protective surfacing), direct access for delivery trucks must be provided. If site is to be graded or leveled, this must be coordinated and approved by installer to ensure adequate anchorage for structure. The owner shall hold Ben Shaffer Recreation harmless in the event of injury due to lack of, or insufficient, resilient surface. Sharp objects (/.6., soorts spikes, heeled shoes, etc.) will
tructure. The owner shall hold Ben Shaffer Recreation harmless in the event of injury due to lack of, or insufficient, resilient surface. Sharp objects (/.6., soorts spikes, heeled shoes, etc.) will damage rubber surface and void surface warranties Ben Shaffer Recreation and its sub-contractors are in no way responsible for any issues associated with product design, manufacturing defect, lack of resilient surfacing or maintenance thereof, | have read, understood, and agree to the above conditions. Signed: Print Name: Date: Please sign/save and email to sales@benshaffer.com: or print and fax to 973-663-4615. : Degnan Bleachers Page 4/4 A EPR SP EEE ESS
File revisions (1)
- Sep 29, 2026
7a1def62c31c11,584,340 bytes