Packet · Nov 12, 2024
Township Council Meeting — Packet
7a1def62c31c151b6c4bb4838998e5f15a5f59d5e0238037444733552be335adIndexed text · page 25
Show all pages12. Devon Drive and Mountain Way 13. Mountain Way S and Mountain Way 14. Cullen Drive and Carlson Road As part of the deliverables, Consultant is to prepare a short report for each intersection which details findings and recommendations for changes including a recommendation for the installation of stop signs were appropriate consistent with the 11th edition of MUTCD. II. ALL WAY STOP ANALYSIS FOR THE INTERSECTIONS OF: LOWELL AVE. AND MOUNTAIN WAY AND LUDDINGTON RD. MISSISSIPPI AVE. AND MAPLE ST. Consultant will conduct a field investigation at each location to evaluate existing intersection(s) geometry, observe traffic patterns, review available sight distance and identify other deficiencies within the study area. Also, consultant will review the available crash history from the West Orange Police Department to confirm if a significant crash history is present. If necessary, consultant will review available crash history from NJDOT’s Safety Voyager system to confirm if significant crash data is present. The following tasks are to be conducted: A. Perform intersection turning movement counts at the intersection(s) from 6:00 AM to 7:00 PM on a mid-week weekday (Tuesday, Wednesday, or Thursday) when schools are in regular session to establish existing intersection volumes. B. Conduct a stop warrant analysis in accordance with section 2B.12 of the 11th Edition of the MUTCD. C. Perform peak hour level of service analysis for the intersection(s) under existing conditions and with any recommended changes. D. Consultant will prepare a letter report for each intersection which details findings and recommendations. E. Include at least 1 meeting. Proposals shall be on a lump sum basis for each task. Hourly rates shall be submitted with all proposal for any additional work. Proposals shall be submitted in writing on or before 10:00 A.M. Friday October 25, 2024 to the Department of Engineering, 25 Lakeside Avenue, West Orange, NJ 07052 and shall include a specified completion date or number of days required for completion of the work after approval is granted to proceed. Also, evidence of proper insurance shall be submitted for approval by the Township Attorney. Very truly yours, Zayibeth Y. Carballo Zayibeth Y. Carballo, Director/Municipal Engineer ZYC/ag AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org
File revisions (1)
- Sep 29, 2026
7a1def62c31c11,584,340 bytes