Packet · Nov 12, 2024
Township Council Meeting — Packet
7a1def62c31c151b6c4bb4838998e5f15a5f59d5e0238037444733552be335adIndexed text · page 73
Show all pagesREIMBURSABLE RATES Outside (pass-thru) Services Postage, Federal Express, UPS, DHL Travel (meals, tolls, etc.) Paper Black/White Copy/Prints – A Size (8.5”x11”) Paper Black/White Copy/Prints – B Size (11”x17”) Paper Color Copy/Prints – A Size Paper Color Copy/Prints – B Size Paper Plots and Printing – B Sheet Paper Plots and Printing – C Sheet (18”x24”) Paper Plots and Printing - D Sheet (24”x36”) Paper Plots and Printing - E Sheet (30”x42”) Signed/Sealed Plots – C Sheet Signed/Sealed Plots – D Sheet Signed/Sealed Plots – E Sheet Mylar Plots Color Plots – D Sheet Color Plots – E Sheet Exhibit Mounting – D Size Exhibit Mounting – E Size Reports (Size ¼” – ¾”) Reports (Size 1” – 2”) Notary Public Services High Resolution Aerial Imagery Digital Signatures (Initial) Digital Signatures (Each Additional) CD/DVD Preparation USB – Memory Stick/Thumb Drive Electronic Document Preparation Digital Shapefiles Tax Maps FTP Site Usage Mileage cost cost cost $ 0.20/sheet $ 0.40/sheet $ 3.00/sheet $ 5.50/sheet $ 2.50/sheet $ 3.50/sheet $ 4.25/sheet $ 4.75/sheet $ 4.75/sheet $ 5.25/sheet $ 5.75/sheet $ 6.75/sq. ft. $ 40.00/sheet $ 50.00/sheet $ 85.00/board $110.00/board $ 20.00 - $30.00 $ 35.00 - $65.00 $ 15.00 $100.00/image $200.00/each $ 50.00/each $ 30.00/each $ 40.00/each $ 30.00 up to the first 5 sheets Plus $5.00/sheet over 5 sheets $200.00/each $ 35.00/sheet $ 25.00/unit As published by the IRS Moisture Content Determination Moisture Content Determination (as additional test) Modified Proctor Washed Gradation Atterberg Limits Determinations (Inorganic) Tube Permeameter Organic Content by Loss on Ignition Concrete Cylinders (cast or retained) Sample Pick up/Delivery to Laboratory Sample Storage (Beyond 60 days) Nuclear Density Gauge $ 50.00/each $ 15.00/each $350.00/each $ 90.00/each $110.00/each $200.00/each $ 75.00/each $ 20.00/each $ 90.00/hour $ 50.00/month $ 95.00/day On-site inspection services by staff engineer or technician will be invoiced at full day increments for services exceeding 4 hours on site or a minimum ½ day charge for less than 4 hours on-site.
File revisions (1)
- Sep 29, 2026
7a1def62c31c11,584,340 bytes