Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 12, 2024

Township Council Meeting — Packet

Preserved file SHA-2567a1def62c31c151b6c4bb4838998e5f15a5f59d5e0238037444733552be335ad

Indexed text · page 80

Show all pages
Page 80

Ms. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Stop Control and All Way Stop Analysis        October 24, 2024 Page 3 Evaluate the field conditions and the data collected in accordance with the engineering study criteria set forth in the MUTCD Section 2B.12, All-Way Stop Applications, relative to crashes and minimum volumes Review the need to control left-turn conflicts at the intersection Review the need to control vehicle and pedestrian conflicts at the intersection Review available sight distance at the intersection in accordance with AASHTO standards Evaluate operational characteristics of the intersection including Existing and Proposed Level of Service, Capacity and Delay Analyses using the Highway Capacity Software in accordance with the latest Highway Capacity Manual at the study intersection Prepare a Summary Report of the MUTCD All-Way Stop Analysis including recommendations Attend one meeting to review the report Total Lump Sum Fee for All Way Stop Analysis Services ........... $26,600.00 Total Lump Sum Fee for Services .................................................. $57,786.00 Exceptions:  Any work not specified as listed in the above phase shall be considered additional services and will be invoiced at the time said work is authorized by the Township. Should this fee estimate meet your approval, please provide our office with a professional services agreement or resolution as an indication of the work to proceed. In the meantime, should you have any questions concerning this matter, please do not hesitate to contact this office. Very truly yours, CME Associates Trevor J. Taylor, PE, PP, CME, CFM For the Firm TT/kec/jcw S:\West Orange\Proposals\24110-24 West Orange Stops AW Stops.docx

File revisions (1)