Show all pagesSafety Study Cullen Drive & Carlson Road Project No.: 241193 February 4, 2025 Page 6 of 7 STOP Sign Installation – A STOP control on the minor-road approach should be considered as per Section 2B.11-Minor Road Stop Control of the MUTCD (11 th Edition). The STOP sign would provide the appropriate traffic control at the study intersection to improve safety and circulation of traffic. We recommend that the Township install a STOP sign on Cullen Drive at the study intersection. The installation of the STOP sign should be implemented per the guidance presented within Chapter 2B-Regulatory Signs, Barricades, and Gates of the MUTCD (11 th Edition). FIGURE 4 – STOP Sign Installation CARLSON ROAD Striping and Signages –We recommend that the Township provide a stop bar and double yellow line striping on Cullen Drive to support the stop sign. Sidewalk and Crosswalk Markings – We recommend that the Township maintain their sidewalks, and update their marked crosswalks within the study area to improve pedestrian safety and circulation. The implementation of the roadway striping, and signs should follow the guidance presented within the latest edition of the MUTCD. 70 South Orange Avenue, Suite 109 Livingston, New Jersey 07039 C: (732) 236-7557 T: (973) 228-0999 F: (201) 753-3904 BrightViewEngineering.com PO Box 99 Roseland, NJ 07068
File revisions (1)
- Sep 29, 2026
2f7a654dd08717,937,770 bytes