Packet · May 20, 2025
Township Council Meeting — Packet
9958560b9b2ec218de739b31b21fb971e9f4bb4fffb093a02e6159f799573ceeIndexed text · page 165
Show all pagesProject Summary Kennedy Park Playground Improvements Borough of Norwood, New Jersey Neglia Group has been involved in many different projects at Kennedy Field in Norwood, including the playground's improvement. Engineering, Survey, GIS, and Landscape Architecture services allowed for the installation of a modular block retaining wall, a chain link fence, a concrete sidewalk, a pour-in-place safety surface, and playground equipment. The new playground is designed to be ADA-compliant and is wheelchair accessible. The site has other unique features, like a landscaped seat wall and picnic area. Additionally, a raised landscape terrace design saved several mature trees during construction. Project at a Glance Client: Borough of Norwood Contact: Jordan Padovano Borough Administrator (201) 784-2965 Services Provided: Engineering Services Survey GIS Landscape Architecture Completion: November 2023 Project Values: Construction $700,000.00 201-939-8805 | negliagroup.com
File revisions (1)
- Sep 29, 2026
9958560b9b2e23,768,465 bytes