Packet · May 20, 2025
Township Council Meeting — Packet
9958560b9b2ec218de739b31b21fb971e9f4bb4fffb093a02e6159f799573ceeIndexed text · page 210
Show all pagesTable 1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity Stormwater Minimum Best Runoff Quality Stormwater Separation from Management TSS Removal Runoff Groundwater Seasonal HighPractice Rate Quantity Recharge Water Table (percent) (feet) Cistern 0 Yes No -- Dry Well(a) 0 No Yes 2 Grass Swale 50 or less No No 2(e) 1(f) Green Roof 0 Yes No -- Manufactured Treatment Device(a) (g) 50 or 80 No No Dependent upon the device Pervious Paving System(a) 80 Yes Yes(b) No(c) 2(b) 1(c) Small-Scale Bioretention Basin(a) 80 or 90 Yes Yes(b) No(c) 2(b) 1(c) Small-Scale Infiltration Basin(a) 80 Yes Yes 2 Small-Scale Sand Filter 80 Yes Yes 2 Vegetative Filter Strip 60-80 No No -- (Notes corresponding to annotations (a) through (g) are found after Table 3) Table 2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3) Stormwater Minimum Best Runoff Quality Stormwater Separation from Management TSS Removal Runoff Groundwater Seasonal High Practice Rate Quantity Recharge Water Table (percent) (feet) Bioretention System 80 or 90 Yes Yes(b) No(c) 2(b) 1(c) Infiltration Basin 80 Yes Yes 2 15
File revisions (1)
- Sep 29, 2026
9958560b9b2e23,768,465 bytes