with the mandates of the Mediation Order and participate in the mediation assigned to the Mediator; and be it further RESOLVED, that the Township is authorized to pay its share of the Mediator’s rate consistent with the Mediation Order and the Local Civil Rule 301.1 for the United States District Court for the District of New Jersey; and be it further RESOLVED, that this Resolution shall be made available in the Township Clerk’s Office for reasonable inspection in accordance with applicable law. Karen J. Carnevale, R.M.C. Township Clerk Joe Krakoviak Council President Adopted: October 16, 2025 I hereby certify funds are available from Account No.: John Ditinyak, CFO 2
Case 2:20-cv-12650-CCC-LDW Document 62 Filed 09/24/25 Page 1 of 1 PageID: 630 218218-25-25 214-23 NOT FOR PUBLICATION UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEW JERSEY ITALIAN AMERICAN ONE COALITION, Plaintiff, VOICE Civil Action No.: 20-cv-12650 MEDIATION ORDER v. TOWNSHIP OF WEST ORANGE and MAYOR ROBERT D. PARISI, in his official capacity as Mayor of the Township of West Orange, Defendants. This matter having come before the Court by way of defendants’ motion to dismiss (ECF No. 57) plaintiff’s third amended complaint (ECF No. 54); and it appearing that mediation would conserve the resources and be in the best interests of the Court and the parties; IT IS on this 24th day of September 2025, ORDERED THAT: 1. This civil action be and hereby is referred to mediation. 2. Counsel and the parties shall participate in mediation and shall cooperate with the Mediator: Sheryl M. Goski, Esq., 414 Washington Boulevard, Sea Girt, NJ 08750. 3. Counsel and the parties (including individuals with settlement authority) shall attend mediation sessions as requested by the Mediator. 4. Defendants’ motion to dismiss (ECF No. 57) is administratively terminated without prejudice. To the extent this matter is not resolved through mediation, the parties shall advise the Court by letter and the motion shall thereafter be reinstated. SO ORDERED. /s/ Claire C. Cecchi CLAIRE C. CECCHI, U.S.D.J.
220-25 October 16, 2025 RESOLUTION WHEREAS, on September 19, 2023, the Township Council for the Township of West Orange (the “Township”) adopted Resolution 338-23 authorizing award of a contract to LensLock, Inc. with offices at 3550 Buschwood Park Drive, Suite 180, Tampa, Florida 33618 (“LensLock”) for the purchase of Body Worn Cameras and In-Car Camera Audio/Video Recording System as well as the retention of services related to the cameras and audio/video recording systems including redaction of videos, on-site repair and training; and WHEREAS, pursuant to the terms of the Agreement the retention of LensLock to perform services were at an annual rate of $71,604.80 paid from the Grant SY21 Body Worn Camera for a period of two (2) years with an option to extend the term for an additional one (1) year; and WHEREAS, the two (2) year term is set to expire on November 1, 2025; and WHEREAS, the Township seeks to exercise the third year of the Agreement. NOW, BE IT HEREBY RESOLVED, by the Township Council of the Township of West Orange hereby exercises the option to extend the term of the Agreement for an additional one-year period; and it is further RESOLVED that notice of this award shall be published and available in the Clerk’s office in accordance with applicable law. Karen J. Carnevale, R.M.C. Municipal Clerk Joe Krakoviak, Council President Adopted: October 16, 2025 I hereby certify that funds are available in Account No. 01-2040-41-2150-222. John Ditinyak, Chief Financial Officer 4935-2902-7184, v. 1
221-25 October 16, 2025 RESOLUTION APPROVING A PROPOSAL FROM MATRIX NEW WORLD FOR ENVIRONMENTAL SERVICES FOR DEMOLITION OVERSIGHT & LSRP SERVICES AT 4-10 CENTRAL AVENUE (FORMER BIDDLEMAN INC. SITE) NTE $19,120.00 WHEREAS, on September 24, 2025, the Township of West Orange (the “Township”) received a proposal from Matrix New World Engineering, Land Surveying, and Landscape Architecture, P.C. (“Matrix”) to perform environmental services at: 4-10 Central Avenue (Former Biddleman Inc. site), West Orange, New Jersey, also known as Block 9 Lots 32 on the Township of West Orange Tax Map; and WHEREAS, the former Biddleman Inc. site is part of the Central Valley Brownfield Development Area (BDA) as identified by the New Jersey Department of Environmental Protection (NJDEP) Office of Brownfield and Community Revitalization; and WHEREAS, the work will consist of Matrix providing building demolition oversight to ensure impacted materials are segregated from materials suitable for reuse on-site and that impacted materials are properly disposed off-site, additional waste classification and testing if required by the disposal facility, LSRP oversight and project management associated with the work herein; and NOW, BE IT HEREBY RESOLVED BY THE TOWNSHIP COUNCIL OF THE TOWNSHIP OF WEST ORANGE, that the Township accepts the proposal from Matrix attached herein as Exhibit “A,” not to exceed $19,120.00 to complete the scope of work; AND FURTHER RESOLVED, that a copy of this Resolution shall be made available in the Clerk’s office in accordance with applicable law. Karen J. Carnevale, R.M.C. Municipal Clerk Joe Krakoviak Council President Adopted: October 16, 2025 I hereby certify funds are available from Account No.: 2021 Capital Budget Account #03-2662-21-0100-010 $19,120.00 John D. Ditinyak, Chief Financial Officer
Matrix New World Engineering, Land Surveying and Landscape Architecture, P.C. 26 Columbia Turnpike Florham Park NJ 07932 973.240.1800 www.mnwe.com 221-25 September 24, 2025 Township of West Orange Attn: Ms. Zayibeth Carballo & Mr. Peter Smeraldo 66 Main Street West Orange, New Jersey 07052 RE: PROPOSAL FOR ENVIRONMENTAL SERVICES – DEMOLITION OVERSIGHT AND LSRP SERVICES. TOWNSHIP OF WEST ORANGE, ESSEX COUNTY, NEW JERSEY FORMER BIDDELMAN, INC. 4-10 CENTRAL AVENUE, BLOCK 9, LOT 32 WEST ORANGE, NEW JERSEY NJDEP SRP PI NO. G000006148, ISRA CASE NOS. E200050486 & E86699 NJDEP CASE NO. 17-04-20-1128-26 MATRIX NO. 18-286 Dear Ms. Carballo & Mr. Smeraldo: Matrix New World Engineering, Land Surveying and Landscape Architecture, PC (Matrix) is pleased to present this proposal to the Township of West Orange (Township) for the above referenced activities at the Former Biddelman, Inc. (Site) property located at 4-10 Central Avenue (Block 9, Lot 32) in the Township of West Orange, New Jersey. The Site is approximately 0.93-acres, rectangular in shape, and is currently improved with a two -story cinder block building on a concrete slab foundation (9,900 square-foot building) that has been vacant since 2004. The remainder of the Site consists of an asphalt paved and gravel parking lot, and a small grassy area. The existing building is pending demolition by Blue World Construction prior to Site remediation and redevelopment. In an effort to reduce overall redevelopment costs for the Township, Matrix completed in-situ building material characterization sampling to identify material associated with the existing building that may be utilized as fill for beneficial reuse during redevelopment of the Site. SCOPE OF WORK Matrix proposes to conduct limited oversight during demolition activities to ensure areas of the building that qualify as “fill for beneficial reuse” are properly segregated from impacted material that will require off-site disposal, following demolition. This scope of work for the oversight is based on the Blue World Construction Bid submitted on June 23, 2025, for the demolition of the Biddelman Building. The bid from Blue World Construction is based on the May 2025 Limited Demolition Specifications, April 2025 Summary of Concrete Sampling Activities, February 2025 Regulated Building Material Investigation Report, and the May 2025 materials Management Plan. All
5 Limited Demolition Specifications, April 2025 Summary of Concrete Sampling Activities, February 2025 Regulated Building Material Investigation Report, and the May 2025 materials Management Plan. All activities will be overseen and directed by a Matrix Licensed Site Remediation Professional (LSRP). A more detailed scope of services is presented in the Tasks summarized below. Task 1 – Building Demolition Oversight Building demolition will occur following completion of asbestos abatement activities. Matrix understands that abatement activities will be conducted by a licensed New Jersey Department of Labor (NJDOL) asbestos abatement subcontractor that has been retained by Blue World Construction. Asbestos abatement monitoring and air sampling services are included in the Bid from Blue World Construction. Matrix conducted characterization via in-situ sampling of the building materials (i.e., concrete slab, cinder block walls, and exterior brick walls) to determine if the material would quality for on -site beneficial reuse as fill during redevelopment. Based on the results of the building material sampling conducted by Matrix, all cinder block and brick can be utilized as beneficial reuse fill on-site. However, portions of the concrete floor slab on both the first and second floor of the building require segregation and off -site disposal at an approved facility, as summarized in the Concrete Sampling Letter Report submitted in April 2025, and the Materials Management Plan submitted in May 2025 by Matrix to the Township. F:\2018\18-286 Biddleman - 8-10 Central Avenue\Proposal\Demolition Oversight_2025\Twp. of West Orange-Biddelman-Demolition Oversight_Final_9.24.2025.doc 1
Prior to demolition activities, Matrix will demarcate the areas on both the first and second floor of the building where impacts have been identified and delineated. These areas of the concrete slab will require segregation during demolition and off-site disposal at a New Jersey Department of Environmental Protection (NJDEP) approved facility . Matrix will coordinate with the demolition contractor to ensure the impacted concrete slab is properly segregated from material to be reutilized as beneficial use fill and staged on plastic or loaded into roll -off containers for off-site disposal at an approved landfill. Construction debris that qualifies for beneficial reuse including building foundation footings, will be crushed and stockpiled separately for future reuse as fill during Site redevelopment. Based on the Bid from Blue World Construction, Blue World is anticipating being on-site for approximately 41 days. Matrix has budgeted oversight for four hours a day for a total of ten days. Task 2 – Waste Classification Sampling (if required) The demolition contractor will be responsible for contracting with an appropriate disposal facility to accept the impacted portions of the concrete building slab. Building material sampling conducted previously by Matrix identified Extractable Petroleum Hydrocarbons (EPH), tetrachloroethene (PCE), and several metals including cadmium, copper, and lead in the concrete, at concentrations exceeding the NJDEP applicable soil remediation standards (SRS). Although data exists from the building material sampling to provide to the disposal facility selected by the demolition subcontractor, additional analysis may be required based on the requirements of the chosen disposal facility before the material can be accepted by the facility. Therefore, additional waste classification sampling may be required based on the receiving facility sampling requirements. Since the specific receiving facility is unknown, Matrix assumes up to two (2) additional waste classification samples will be collected from the impacted material, if required. The samples will be submitted to a New Jersey certified laboratory and analyzed for Full Toxicity Characteristic Leaching Procedure (TCLP), total polychlorinated biphenyls (PCBs), and reactivity, ignitability, and corrosivity (RIC). The sample s will be analyzed on a standard 7-day turnaround time (but is
ristic Leaching Procedure (TCLP), total polychlorinated biphenyls (PCBs), and reactivity, ignitability, and corrosivity (RIC). The sample s will be analyzed on a standard 7-day turnaround time (but is budgeted for 3-day turnaround time due to potential time constraints). Upon receipt/evaluation of analytical results, Matrix will submit the required documentation to the receiving disposal facility for approval, transportation and off-site disposal. Task 3 – LSRP Oversight and Project Management This task includes project management and the anticipation of future conference calls and/or meetings with the project team. As a part of this task, the Matrix LSRP will oversee the activities outlined above. Please note that the disposal of the concrete and beneficial reuse of fill on the Site will be captured in the Remedial Action Report to the NJDEP. Reporting costs to the NJDEP are not included in this proposal. COSTS All work will be conducted in accordance with the previously transmitted standard terms and conditions and LSRP Special Provisions. It is proposed that this work will be performed on a time & material not-to-exceed basis. The following are our estimated costs for the tasks described herein. Task 1 – Building Demolition Oversight Labor .................................................................................................................................................................................... $9,670.00 Expenses (Tra vel, Equipment, etc.) .............................................................................................................................. $1,290.00 Tota l C ost for Task 1 .........................................................................$10,960.00 Task 2 – Waste Classification Sampling (if required) Labor .................................................................................................................................................................................... $1,460.00 Expenses (Analytical , Travel, Equipment, e tc.) .......................................................................................................... $2,590.00 Tota l C ost for Task 2 ........................................................................... $4,050.00 Task 3 – LSRP Oversight and Project Management Labor
........................... $2,590.00 Tota l C ost for Task 2 ........................................................................... $4,050.00 Task 3 – LSRP Oversight and Project Management Labor .................................................................................................................................................................................... $4,110.00 Tota l C ost for Task 3 ........................................................................... $4,110.00 Tota l Estimate d Cost with Waste Classification .....................$19,120.00 Tota l Estimate d Cost without Was te Class ifica tion ...............$15,070.00 F:\2018 \18-286 Biddleman - 8 -10 Central Avenue\Proposal\Dem olition Oversight_ 2025\ Twp. of West Orange -Biddelman-Demolition Oversight_ Final_9.24. 2025.doc 2
ASSUMPTIONS Based on the current understanding of the proposed project, Matrix has made the following assumptions: • Field work will be subject to the acceptable hours of the facilities. • Costs do not include the investigation or samples of any other AOCs. • Costs do not include additional sampling or oversight activities other than those outlined in this proposal. • Costs do not include future investigations or remediation. • All work will be conducted under our standard terms and conditions. • All external costs will be charged at cost pus 15%. • There will be no project delays due to access restrictions. • Access will be provided by others. • All field work will be completed in Level D personal protective equipment. • The following work is specifically excluded from the proposal; topographic surveys, underground GPR services, environmental investigations, construction observations and administration. • All time billed to the project will be subject to the approval of the Township of West Orange . CLOSING This proposal is submitted solely and exclusively for the use of Township of West Orange for consideration of the professional services of Matrix. Disclosure of this proposal’s content to any third party without prior written authorization from Matrix is expressly prohibited. In addition to the specific items as listed herein, the client may be required to demonstrate compliance with certain permit and approval conditions as may be imposed by one or more of the regulatory agencies. These conditions may require revisions to the plans and/or preparation of additional supporting documentation. This proposal does not include these additional items unless specifically outlined within the scope of this proposal. PAYMENT SCHEDULE Payment shall be in accordance with the Charges, Billing, and Payment schedule outlined in the previously transmitted Terms and Conditions unless prior written arrangements have been made with Matrix. Please indicate your acceptance of this proposal by signing in the space provided below and returning one copy to this office. Acceptance of this proposal signifies the clients’ understanding that Matrix will not be retained or asked to perform any services unless funding is secured and is available to pay all invoices within 30 days. Receipt of the signed proposal shall be considered authorization to proceed with all items described