ASSOCIATES Leonard R. Lepore, Municipal Engineer March 7, 2022 Township of West Orange Our File No, 2022-053B Re: Mitchell Street - From Valley Road to The Limits with The City of Orange Page 2 Construction Administration Phase Services Our office will provide construction management of the roadway improvements for the anticipated contract time including the following services: 1. Coordinate and attend pre-construction meeting; Coordinate with the contractor to ensure compliance with the final contract documents; Provide assistance with interpretation of contract documents; Review shop drawings; Provide construction observation services; Prepare progress pay estimates; Prepare punch lists required to be addressed by the contractor prior to close out; Prepare final pay estimate and close out change order; and, © M9 NOARYN Coordinate with the Township and CDBG offices for reimbursement of the respective grant funding. Total Lump Sum Fee - $20,000.00 The above fee estimates are based on information provided to us by the Township. Should the scope of the project change requiring additional professional fees, we will detail same in writing and seek authorization prior to proceeding. Should you accept our fee estimate, kindly provide a purchase order or professional services Resolution authorizing same. Should you have any questions or wish to discuss the above further, please do not hesitate to contact this office. Very truly yours, hasociates lor, \PE, PP, CME TT: pv Cc: Zayibeth Carballo, PE, PLS Tina Benevento Andrea Zeligman Engineering@westorange.org ‘S\West Orange\Propcsals\22-03-07 -2020 CDBG Mitchell Street CONAD. doox

Page 21

SUBURBAN CONSULTING ENGINEERS, INC. March 7, 2022 Township of West Orange Department of Public Works 25 Lakeside Avenue West Orange, New Jersey 07052 Atin.: Leonard R. Lepore Director of Public Works, Municipal Engineer Re: — Township of West Orange, County of Morris, State of New Jersey Professional Civil Engineering & Land Surveying Services Request for Proposals Mitchell Street Engineering & Land Surveying Services Our File No.: Proposal SCE-P12841.011 Dear Mr. Lepore: SUBURBAN CONSULTING ENGINEERS, INC. (SCE) is pleased to provide the following proposal for surveying and engineering services to the Township of West Orange (Township) for the necessary construction plans, specifications, and bid documents for the following Community Development Block Grant (CDBG) project for 2020: «Mitchell Street - from Valley Road to the limit with the City of Orange SCE has reviewed the Request for Proposal (RFP) dated February 11, 2022, and has familiarized ourselves with the project specifics. It is understood the total length of the project is approximately 660 LF within a fifty (50) foot wide Right-of-Way (ROW). SCE has reviewed the maps that were included in the RFP, and our proposal includes all work required to provide a complete design and bid package including cost estimates, construction plans, detour plans and technical specifications (twenty (20) copies each) for bidding purposes. The bid package will meet current New Jersey Department of Transportation (NJDOT) and New Jersey CDBG requirements. All services for this project will be overseen by a State of New Jersey Licensed Professional Land Surveyor (PLS) and a State of New Jersey licensed Professional Engineer (PE). Scope of Services SCE proposes the following scope of services for each task in accordance with the RFP. Partial Topographic Survey SCE will provide a Partial Topographic Survey for the purposes of the design of improvements to the existing streets. This will include a level of detail required for a mill and overlay project with pavement markings, brick strips between the sidewalk and curb as well as Americans with Disabilities Act (ADA) ramp improvements. SCE's in-house survey 96 U.S. Highway 206, Suite 101, Flanders, New Jersey 07836 P: (973) 398-1776 | www.suburbanconsulting.com

Page 22

SCE-P12841.011 March 7, 2022 crew personnel will be mobilized to the site and will utilize state-of-the-art survey equipment including but not limited to GPS and robotic stations to conduct topographic and planimetric survey of the improvement area. Establishment of horizontal and vertical datum consistent with NAD-83 / NAVD-88 will be the basis for the survey control. Planimetric mapping of the project areas will be developed from the site survey, with a maximum scale of one (1) inch equals thirty (30) feet (1" = 30') to depict the project limits. Topography will be depicted at one (1) foot contour intervals with appropriate spot grade elevations. SCE will depict the location of underground utilities within the project area based on existing mark-out, the visible surface structures, and review of previously available mapping provided to SCE. All available utility information will be identified and noted at both surface and subsurface levels. The field survey work will depict current site conditions, surface features, and topography which will extend approximately fifty (50) feet beyond the gutter line limits of the intersecting roadways. SCE will utilize Civil 3D design software to map and model the existing and proposed conditions. The model will be utilized to establish proper grading and ADA improvements. It should be noted that a ROW survey of each roadway or establishment of the adjacent property lines is not included in this scope of work. Should either of these surveys be required, a separate proposal for such services will be provided. SCE will provide a field survey of Mitchell Street from Valley Road to the Municipal boundary with the City of Orange Township. Tasks for the approximately 660 LF of project will include: * Locate all trees, shrubs, utilities, walks, driveways, structures — 25-feet each side of the centerline and farther where needed for design purposes where there are significant breaks in grade. * Rim elevations of all storm and sanitary sewers, and utility locations. Invert elevations are not anticipated to be necessary for this project. It should also be noted we are anticipating that the Township, prior to our start of field work, will perform the following: 1, Coordinate with all known utilities (sewer, water, gas, electric, cable, etc.) in the area and have them marked out. 2. Provide any existing CAD, GIS, or maps of

Page 22

work, will perform the following: 1, Coordinate with all known utilities (sewer, water, gas, electric, cable, etc.) in the area and have them marked out. 2. Provide any existing CAD, GIS, or maps of the existing roadway and utility improvements. Engineering & Electrical Services Upon completion of the survey, SCE will coordinate and conduct a walk-through site inspection with the Municipal Engineer to identify, detail, and confirm the project rehabilitation scope.

Page 23

SCE-P12841.011 March 7, 2022 SCE will then prepare a complete road program plan set meeting NJDOT and CDBG requirements including milling and paving where possible with supplemental full reconstruction where necessary. The plans will call for the replacement of curb, concrete sidewalks, driveway aprons, handicap ramps, and upgrades to existing catch basins and manholes as identified in the site inspection. SCE will coordinate street lighting design and specifications with Public Service Electric and Gas (PSE&G). In this task, SCE will incorporate a PSE&G red-line diagram into the design and coordinate construction details and electric service design for the proposed street lighting. An Electric Service Plan, a Lighting Plan, and technical specifications for this task will be provided meeting NJDOT project requirements. SCE will provide a cover sheet with an estimate of quantities, construction plans, soil erosion and sediment control plans, and a traffic control plan. SCE will provide technical specifications meeting NJDOT requirements and a cost estimate. SCE will provide the Township with twenty (20) copies of the complete set of design and bid package including cost estimates, plans and specifications for bidding purposes. The complete design will provide for new curbs, new sidewalks (where existing), driveway. and walkway aprons, new two (2) foot brick strip between curb and sidewalk, decorative street lighting footings/foundations and junction boxes, pavement milling and pavement resurfacing, and pavement striping. SCE also understands that Township intends to advertise bids for this project in the Summer of 2022. SCE will include one (1) round of plan revisions for regulatory review comments. Reimbursable Expenses A reimbursable fee for expenses is included as a separate line item below for all anticipated expenses associated with this project. Additional expenses will be billed on a time and material basis in accordance with the Fee Structure provided below. Reimbursable expenses may include mileage, parking and tolls, overnight postage, messenger fees, and printing expenses. Fee Proposal SCE proposes to provide the above referenced scope of services for the following fees. Invoicing for this project will summarize services provided in accordance with the Total Project fee limit indicated below. = Partial Topographic Survey $

Page 23

d scope of services for the following fees. Invoicing for this project will summarize services provided in accordance with the Total Project fee limit indicated below. = Partial Topographic Survey $ 3,450 «Engineering & Electrical Services $ 21,200 * Reimbursable Expenses* Ss 1,500 TOTAL LUMP SUM FEE $ 26,150 *Includes twenty (20) Sets of Plans & Specifications including bid documents and contract agreemenis ($75 per set).

Page 24

SCE-P12841.011 March 7, 2022 Project Schedule SCE is prepared to commence services within two (2) weeks of authorization to proceed. We anticipate the final survey being completed within three (3) weeks. Design to commence upon completion of same and we anticipate six (6) weeks for engineering tasks. This schedule is weather permitting and will require additional time if roads become snow covered and/or inaccessible. Fee Structure SCE will utilize the following fee structure for all tasks where fee is estimated and for any additional work authorized by client or for client-initiated revisions. It should be noted that our fee is based on the specific tasks as explained in the above sections of this proposal. Additional services and items may be determined to be required during the course of the project that have not been included in this cost proposal. Revisions to address any review agency comments that develop during the review process are typically required to obtain approvals. SCE is not able to predict the course of action necessary to address such comments at this time. All costs associated with addressing the review agency comments will be invoiced in accordance with the fee structure on a time and material basis. Principal/Project Officer $160/hour Senior Project Manager $158/hour Project Manager $155/hour Senior Project Licensed Professional $150/hour Project Licensed Professional $145/hour Licensed Professional $135/hour Senior Project Coordinator $150/hour Project Coordinator $145/hour Senior Designer/Senior Survey Analyst $125/hour Designer/Survey Analyst $120/hour Senior Environmental Scientist $125/hour Environmental Scientist $120/hour Senior Project GIS Analyst $140/hour Project GIS Analyst $130/hour GIS Analyst $125/hour Senior GIS Technician $115/hour GIS Technician $105/hour Senior GIS Project Coordinator $130/hour GIS Project Coordinator $125/hour Senior Inspector $115/hour Inspector $105/hour Senior Technician $110/hour Technician $100/hour Project Administrator $115/hour Administrative Support $60/hour Equipment Unit Cost

Page 25

SCE-P12841.011 March 7, 2022 o Unmanned Aerial Systems / Remotely Operated Vehicle $150/hour o = Robotic/LIDAR $50/hour o GPS $25/hour = _LSRP (Licensed Site Remediation Professional) Services Unit Cost o For any environmental services requiring LSRP oversight and certification, a $25/hour unit cost will be included in addition to the hourly rate for roles above. * Any actual disbursements and expenses which we incur on your behalf, such as subconsultant fees, application/permit fees, delivery charges, parking, printing and toll charges will be billed at actual cost-plus 15 percent. «Mileage will be billed in accordance with federal prevailing wage. Services Not Included Unless Authorized It should be noted that our fee is based on the specific tasks as explained in the above sections of this proposal. Services and items which have not been included or made part of this proposal include but are not limited to the following: Metes and bounds description. Location of subsurface conditions (utilities) unless exposed for measurement. Conditions which a complete and accurate litle search would disclose. ROW survey of each roadway or establishment of the adjacent property lines Detection of environmental conditions such as wetlands or hazardous materials. Surveying services other than previously indicated. Owner or Contractor-initiated changes. Review agency required revisions. Application and permit fees. Attendance at the bid opening. Bid review and recommendation. Bid tabulation. NJDOT SAGE Coordination. Soil Erosion and Sediment Control permit. Zoning Board and Planning Board application preparation. Any item not specifically described above. ee Standard Contract Terms & Conditions In accordance with the above information, Client agrees to the following: Termination of Contract Client may terminate this Agreement with seven days prior written notice to Suburoan Consulting Engineers, Inc. (SCE) for convenience or cause. SCE may terminate this Agreement for cause with seven days prior written notice to Client. Failure of Client to make payments when due shall be cause for suspension of services or, ultimately, termination, unless and until SCE has been paid in full all amounts due for services, expenses and other related charges.

Page 26

SCE-P12841.011 March 7, 2022 Hazardous Environmental Conditions It is acknowledged by both parties that SCE's Scope of Services does not include any services related to the remediation at the site of asbestos, PCBs, petroleum, hazardous waste or radioactive materials. Client acknowledges that SCE is performing professional services for Client and SCE is not and shall not be required to become an "arranger", “operator, "generator" or “transporter’ of hazardous substances, as defined in the Comprehensive Environmental Response, Compensation, and Liability Act of 1990 (CERCLA). Ownership of Documents All documents prepared or furnished by SCE pursuant to this Agreement are instruments of SCE's professional service, and SCE shall retain an ownership and property interest therein. SCE grants Client a license to use instruments of SCE's professional service for the purpose of consitucting, occupying and maintaining the Project. Reuse or modification of any such documents by Client, without SCE's written permission, shall be at Client's sole tisk, and Client agrees to indemnify and hold SCE harmless from all claims, damages and expenses, including attorneys' fees, arising out of such reuse by Client or by others acting through Client. Indemnification To the fullest extent permitted by law, Client and SCE each agree to indemnify the other party and the other party's officers, directors, partners, employees and representatives, from and against losses, damages and judgments arising from claims by third parties, including reasonable attorneys’ fees and expenses recoverable under applicable law, but only to the extent they are found to be caused by a negligent act, error or omission of the indemnifying party or any of the indemnifying party's officers, directors, members, partners, agents, employees or sub-consultants in the performance of services under. this Agreement. If claims, losses, damages and judgments are found to be caused by the joint or concurrent negligence of Client and SCE, they shall be borne by each party in proportion to its negligence. Force Majeure Neither party shall be deemed in default of this agreement to the extent that any delay or failure in the performance of its obligations results from any cause beyond its reasonable control and without its negligence. Dispute Resolution Client and SCE agree that they shall first submit any and

Page 26

ure in the performance of its obligations results from any cause beyond its reasonable control and without its negligence. Dispute Resolution Client and SCE agree that they shall first submit any and all unsettled claims, counterclaims, disputes and other matters in question between them arising out of or relating to the agreement to mediation in accordance with the Construction Industry Mediation Rules of the American Arbitration Association, effective as of the date of this agreement. Use of Electronic Media Documents that may be relied upon by Client are limited to those that are signed or sealed by SCE. Unsigned files in electronic media format or text, data, graphic or other types that are furnished by SCE to Client are only for convenience of Client. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. When transferring documents in electronic media format, SCE makes no representations as