PROJECT SUMMARY Township of Berkeley Heights Berkeley Heights, NJ Neglia Group was selected by Berkeley Heights Township to provide Engineering Design and Construction Management services for various streets which are a part of the 2019 Capital Road Program. Neglia’s responsibilities in the realm of this project included rehabilitation of Hamilton Avenue (b/t Park Avenue and the dead end), Rutgers Avenue (b/t Hamilton Avenue and Mountain Avenue), and Princeton Avenue (b/t Park Avenue and the dead end). The integral design elements were pavement mill and overlay, spot pavement reconstruction, select granite block curb and concrete sidewalk replacement, handicap ramp replacement, roadway stripping, driveway apron repairs, drainage structure retrofitting and right-of-way restoration. Neglia conducted a topographic survey extending to the full width of the right-of-way project limits. Project at a Glance Client: The Township of Berkeley Heights Contact: Ms. Liza Viana, Township Administrator (973)-464-2700 Location: Berkeley Heights, NJ Union County Services Provided: Topographic Survey Construction Management Engineering Design Completion: February 2020 Construction Value: $350,313.42

Page 61

PROJECT SUMMARY Green Street and Wesley Street Intersection Township of South Hackensack, New Jersey The Township of South Hackensack selected the Neglia Group to provide engineering services for the intersection and roadway improvements at the intersection of Green Street and Wesley Street. The intersection processes traffic from/ to Route 80, local traffic, and commercial traffic. Services provided for this project included roadway mill and pavement, traffic signal improvements, curb and ADA-ramp installation, and traffic striping. Neglia also prepared a Local Traffic Signal Plan in compliance with the NJDOT, MUTCD (Manual on Uniform Traffic Control Devices), AASHTO (American Association of State Highway and Transportation Officials), and County regulations and standards. Construction Management services were provided for the associated paving on Wesley Street. Project at a Glance Client: The Township of South Hackensack Contact: Donna Gambutti, RMC 201-440-1815 ext. 104 Location: South Hackensack, NJ Bergen County Services Provided: Traffic Engineering Design Engineering Survey Construction Management Bid Coordination Completion: November 2017 Construction Value: $450,000

Page 62

PROJECT SUMMARY 2019 Hasbrouck Heights Road Program (NJDOT & Municipally Funded) Hasbrouck Heights, NJ The Borough of Hasbrouck Heights selected the Neglia Group to provide Professional Engineering, Design, and Investigation Services for the Borough’s 2019 Roadway Improvement Program. Below are the project details of the services that were provided.  Repaved streets that the Borough of Hasbrouck Heights identified as “in need of repaving” and repaved along with identification and remediation of sewer systems in need of repair  Neglia reviewed file maps and other documents of record and performed field surveys to establish approximate right of way lines in all areas undergoing improvement  Neglia held all necessary meetings and research required to coordinate all the Municipal Departments  Performed the final design and prepared Final Plans and Specifications so that Neglia met all Municipal, County, State, and Federal requirements  Prepared preliminary bond estimates and identified grant opportunities from CDBG & NJDOT Project at a Glance Client: Borough of Hasbrouck Heights Contact: Laurie Varga, Borough Administrator (201) 288-0195 Location: Hasbrouck Heights, NJ, Bergen County Services Provided: Investigation Design Survey Engineering Services Raymond Street Completion: June 2020 Construction Value: $720,000

Page 63

PROJECT SUMMARY Rockleigh Road Improvements – Phase II (NJDOT Funded) Rockleigh, NJ The Borough of Rockleigh selected the Neglia Group to provide Professional Engineering, Design, and Construction Management Services for the Borough’s Rockleigh Road Improvements, from Willow Avenue to the New York State Border. Below are the project details of the services that were provided.  Installation of Belgian Block curbing from the curbing terminus of Rockleigh Road and milling and paving of roadway  Neglia reviewed file maps and other documents of record and performed field surveys to establish approximate right of way lines in all areas in need of improvement  Neglia held all necessary meetings and research required to coordinate all Municipal Departments  Performed the final design and prepared Final Plans and Specifications so that they met all Municipal, County, State, and Federal requirements  Neglia prepared preliminary bond estimates and identified grant opportunities from CDBG & NJDOT Project at a Glance Client: Borough of Rockleigh Contact: William J. McGuire Administrator (201)-768-4217 Location: Rockleigh, NJ Bergen County Services Provided: Construction Management Design Engineering Services

Page 63

Design Engineering Services Bid Coordination Rockleigh Road Completion: July 2019 Construction Value: $160,000

Page 64

VITOIN : rae Y i suoyeo07 paloig 4 puabe7 JBAIY DeSSe_ BU} JO UONIOd ® Buoly s}9afo1g JuaD90y ‘ane3 vospni Timor Aust Aunog ussi0g ued HUeGIOATY Ie eo ore en sued Bog Yysee7 yO - Auseey 21 42jeEMUIO}S, dno elon youysiq ssaulsng ye ee en uo Bully YON dita uiing inotog pie 363 EES | Bupwuued 1ANO AGN ‘VOReTEIsU] HNL MON uonesnByuosey pel [e4owey ouljjew udesor uo}Buly YON quowesejdey uonerg dung Jemeg Kueyues ysanypuhy, |W PUe ‘WOOY 194907] Ge4-elq ‘SpIal4 Sses5 pue yn, Jo UONeHTEISUJ pue UoRONASUODeY eJ9]dWIOD aay yynog - Y1eq AjUNOD episieaty - }ssnypUAT ‘uo;BUILY YON ; ry i asnoyjeog Aapnn ‘eljiaalieg ‘Aueey, \ \ \ \ \ X i i SUNoD s|uUa] YINOS apIsseALY Bulsodindoy pue uojonsjsuosey ‘UB}seq sued Ajunog apisiealy - uoj6i i \ \ ‘Aunog uabieg lysnoiog ipeisyien / \ f arena Ive” uoRonysuosey UoHoess0}u) enueay pue|sBuly 9 enueny episienly, ysanypuA] 0/7 duing 19Mag U10}g MON Plots uliserg ‘Auunog xess3 ‘Aig eMON 1A YON UonelDossy Bumoy Jeary o1esseq 40} }Juuag [eulBUQ ‘yo0qeog | BD i if 4 i A i ysanypuk] IIEHNO MeN Baty WNOS sued Ayuno9 ep|sienry - sanypUAT uononssuosey piety [leqeseg Plald UOALL 3 platy feOWweW, = Auunop x0883 Jeary o1esseq 0} aujsumoy Beuresg ym ubseq ysinypuc aBeur , — Pletd s40M0 ‘oR0N ae JOY o1esseq 0} [ I aBeuyesg ym uBIseq s d Plald yoRqzZ}015 fuunoo xase3 Ayinog uebs0g Moe / ju ras ‘Aunoo a1esseg Aig vousio yaforg UoReZIIIGeIS JAY uo Burren ‘Auunog xass3, <diysumol ploywoola ‘Auunos s1esseq fag 2128800, ‘Springer Brook