D FEE: $18,500.00 NJDEP Flood Hazard Area (FHA) Individual Permit Application (if required) As noted within the RFP, the site is subject to a 300 foot wide Riparian Zone regulated under the New Jersey Flood Hazard Area Control Act. Additionally, based on a review of available background mapping, a portion of the site is located within the flood hazard area of a tributary to the Passaic River. If desired improvements are proposed within the flood hazard area or riparian zone of Crystal Lake do not meet FHACA Permit-by-Rule criteria, then prior NJDEP approval pursuant to the Flood Hazard Area Control Act Rules (N.J.A.C. 7:13) will be required. Therefore, if needed, under this item Matrix will prepare and electronically submit to NJDEP an application for a flood hazard area individual permit. The application will be prepared and submitted consistent with the requirements set forth within the Flood Hazard Area Control Act Rules (Rules) in effect as of the date of this proposal. The flood hazard area design flood elevation will be determined using the higher of either Method 1 (DEP Flood Study) or Method 3 (FEMA fluvial method) as outlined in the Rules. It is assumed that activities within regulated areas will comply with the requirements of the Rules. Therefore, an application for a hardship exception from any portion of the Rules is excluded from this scope of work. It is also assumed that disturbance to regulated areas will not exceed any threshold requiring mitigation. FIXED FEE: $19,500.00 7

Page 40

Soil Conservation District Certification This item is for the preparation and submission of soil erosion and sediment control plans, and the accompanying application to the Soil Conservation District as required for a soil erosion and sediment control certification. Any application or permit fees required for this project are expected to be paid directly by the Township and have not been included herein. In addition to the development plan information, and in accordance with the soil erosion and sediment control requirements, the application will include the following: 1. Soil Conservation District application 2. Soil erosion and sediment control plans:  Proposed sequence of development including duration of each phase in the sequence  Site grading plan showing delineation of land areas to be disturbed including proposed cut and fill areas together with existing and proposed profiles  Contours at a minimum two feet interval, showing present and proposed ground elevation  Locations of all streams and existing and proposed drains and culverts  Stability analysis of areas below all points of stormwater discharge which demonstrates a stable condition will exist or there will be no degradation of the existing condition  Location and detail of all proposed erosion and sediment control structures  Locations and details of all proposed nonstructural methods of soil stabilization including types and rates of lime, fertilizer, seed, and mulch to be applied  Control measures for non-growing season stabilization of exposed areas where the establishment of vegetation is planned as the final control measure  Plans with a notation for maintenance of permanent soil erosion, and sediment control measures and facilities during and after construction, also indicating who shall have responsibility for such maintenance FIXED FEE: $4,500.00 Additional permits other than what is listed above are not anticipated for this project. Construction permits will be filed by the contractor awarded to build the project. PHASE 3 - BID PHASE ITEM 1: BID PHASE SERVICES Once the project is out to bid our office will support the Township during the bidding process by providing the following services:  Respond to Contractor’s request for information (RFI) during the bid period  Attend the bid opening  Provide an engineering review of the contractor’s

Page 40

ess by providing the following services:  Respond to Contractor’s request for information (RFI) during the bid period  Attend the bid opening  Provide an engineering review of the contractor’s bids  Provide a written recommendation to the Township of the lowest responsible bidder The bid services described above are for one (1) bidding period. If the project is rebid, Matrix will provide a separate scope and fee for these services. FIXED FEE: $3,300.00 8

Page 41

PHASE 4 - CONSTRUCTION STAGE ITEM 1: Limited Construction Support Services Matrix will provide the following construction support activities during the duration of the construction project:  Attend one (1) pre-construction meeting  Provide drawings to the contractor for obtaining construction permits (3 sets) for the project. It is the contractor’s responsibility to file and obtain all construction permits for the project  Review contractors shop drawings. This includes review of up to one (1) resubmittal of a specific shop drawing  Review contractor’s application for payment  Provide full-time field observations which will include any progress site meetings during the construction of the project (4-week construction period as stated in the RFP)  Provide a punch list for the project If the project extends beyond the construction period described above or the Township requests additional site visits/meetings our office will provide a scope and fee for the additional time required for the project. FIXED FEE: $29,050.00 LIMITED DIRECT EXPENSES Direct expenses are an estimated cost which includes printing, postage (including certified notifications), travel, and other miscellaneous project-related costs. The amount may vary based on the additional requirements of the project and will be billed at the rates provided in this proposal. ESTIMATED FEE: $1,500.00 TOTAL FEE FOR PHASES 1, 2,3 AND DIRECT EXPENSES: $134,500.00 TOTAL FEE FOR PHASE 4: $29,050.00 ASSUMPTIONS AND EXCLUSIONS  All work areas are accessible.  NJDEP Green Acres Program submission or review is excluded  Costs assume that the work described above will be performed in Level D personal protective equipment (PPE)  Costs do not include any activities beyond what is included in this proposal.  This proposal does not include costs to retain an LSRP  Geotechnical investigation or reports  Site specific seismic evaluation  Construction oversight or inspection services beyond what is listed above  Application for any permits or approvals not specifically described above are excluded  Application fees are excluded 9

Page 42

 Any pavement cores, temporary or permanent wells, test pits, or test strips, if and as warranted or required  County or local planning board submissions are excluded  Traffic engineering is excluded  Preparation of a Phase I Environmental Site Assessment (ESA) is excluded  Structural engineering shall be limited to light pole and shade structure foundations and calculations CLOSING Any item listed above which is not ordered will not be billed. Separate authorization from the client will be requested prior to commencing services outside the scope of this proposal. All out-of-pocket expenses including, but not limited to, application fees, laboratory testing costs, mylar copies, certified mailings, photographs, blueprints, and special deliveries are considered additional to the proposal items unless specifically noted within the scope of this proposal. This proposal is submitted solely and exclusively for the use of the Township of West Orange for consideration of the professional services of Matrix. Disclosure of this proposal’s content to any third party without prior written authorization from Matrix is expressly prohibited. In addition to the specific items as listed herein, the client may be required to demonstrate compliance with certain permit and approval conditions as may be imposed by one or more of the regulatory agencies. These conditions may require revisions to the plans and/or preparation of additional supporting documentation. This proposal does not include these additional items unless specifically outlined within the scope of this proposal. 10

Page 43

SECTION 2 – KEY PERSONNEL ORGANIZATION CHART RESUMES

Page 44

Organization Chart Project Manager Phil Scott, PE Civil Engineering Surveying Evan Jacobs, PE, PP, CFM Sean Savage, PE Bert Wyness, PLS, CH Landscape Architecture Ecological/Regulatory MEP Engineering Bill Reimer, LLA, RLA Robert Fiorile Christopher Strunk, PE Township of West Orange| RFP | Oskar Schindler Performing Arts Center (OSPAC) and Crystal Lake Improvements

Page 45

PHILLIP SCOTT, PE, CME Project Manager Professional Qualifications Mr. Scott serves as a Senior Project Manager with over 24 years of experience in the public and private sectors. Mr. Scott was formerly the Director of Engineering at the City of Newark responsible to improve, maintain, plan, operate, and repair the City's infrastructure. He was responsible for improvements and enhancement of roadways, traffic and transportation, municipal parks, code enforcement and the office of the Uniform Construction Code. As Director of the Department of Engineering, Mr. Scott oversaw a staff of approximately 150 employees, managed a budget of over $14 million, was the Mayor’s voting representative on the Board of Trustees for the North Jersey Transportation Planning Authority (NJTPA), and served as the City’s flood administrator for FEMA. The majority of his experience has been associated with residential subdivisions and office/commercial site developments. He has extensive experience in urban revitalization and the redevelopment of affordable housing sites. Mr. Scott is also responsible for several large redevelopment projects in Newark and the surrounding municipalities. Professional Experience One Theatre Square, Newark, NJ - Project Manager for the development of NJPAC’s first major expansion since its opening in 1997. The project consists of the construction of a 22-story residential tower with over 250 rental apartment units, sub-station for the Newark Police Department, parking garage, and a streetscape with 20,000 sq. ft. of high-quality retail. EDUCATION B.S. Civil Engineering, New Jersey Institute of Technology, 1998 PROFESSIONAL REGISTRATIONS Professional Engineer – New Jersey, #24GE04417900, 2003 Certified Municipal Engineer – New Jersey, #04-37 PROFESSIONAL AFFILIATIONS Walter G. Alexander Redevelopment, City of Orange, NJ - Project American Society of Civil Engineers Manager for redevelopment project in the Central Orange Redevelopment New Jersey Society of Professional Plan area comprised of two phases – Family Housing and Senior Housing. Engineers The Family Housing component consists of the demolition of an existing highrise public housing building and is being replaced with 66 rental townhouse units and community space. The Senior Housing component consists of the demolition of an existing high-rise public housing building and is being replaced

Page 45

and is being replaced with 66 rental townhouse units and community space. The Senior Housing component consists of the demolition of an existing high-rise public housing building and is being replaced with 48 senior rental units in a single building that is designed to complement the adjacent townhouse development design from the previous phase of development. City of Newark, Passaic Tidal Coastal Risk Management Study, USACE - The U.S. Army Corps of Engineers, New York District is conducting a study in partnership with the NJDEP to evaluate potential coastal storm risk management measures for the tidally influenced and surge-prone areas in the lower Passaic and Hackensack Rivers, and Newark Bay, New Jersey that were included in the authorized Passaic Main Stem project. It includes portions of the City of Newark (Essex County), and its suburbs of Harrison and Kearny (Hudson County). US Army Corps of Engineers (Newark Flanking Plan + Minish Park). NEWARKGO, Shared Micromobility Pilot Project - Lead the development and creation of the City of Newark’s share program that has brought 2,000 bikes and e-scooters to all neighborhoods in the city. NewarkGO Shared Micromobility Pilot Project, Establishing Ordinance + Program rules and regulations. City of Newark, Small Cell Wireless Facility (5g) Ordinance and Regulations (Small Cell Coordinator) - Lead the development and creation of the City of Newark’s Small Cell Wireless Facility Permitting Process which included and not limited to, establishment and adoption of a Municipal Ordinance, adoption of a Wireless Telecommunications Facilities Manual and created a permitting process in accordance with FCC rules and orders. Small Cell Wireless Facility (5G) Regulations + Ordinance. A. Harry Moore Redevelopment, Jersey City, NJ - Project Manager for the phased redevelopment of a Jersey City Housing Authority site. The residential development comprised of five mid-rise buildings and associated parking.

Page 46

PHILLIP SCOTT, PE, CME Project Manager City of Newark, Stormwater Utility Fee Feasibility Study - Evaluating the City’s ability to create and implement New Jersey’s first stormwater utility designed to effectively manage and maintain Newark’s stormwater infrastructure, create a dedicated funding source to implement Best Management Practices, and identify and implement required activities to ensure State and Federal regulatory compliance. City of Newark Energy Savings Plan - Lead the City’s efforts to develop and implement a comprehensive Energy Savings Plan in seventeen of the most energy intensive public buildings with the goal of identifying and implementing cost-effective and creative solutions to reduce our municipal energy consumption by at least 20 percent. Newark Greenstreets Report - Feasibility study funded by the North Jersey Transportation Planning Authority, focused on assessing the City’s ability of installing green infrastructure systems within the public rights-of-way to help manage stormwater runoff during precipitation events, improve quality of life for City residents and complied with local, State, and Federal transportation regulations. Central Avenue Revitalization Streetscape, East Orange, NJ - Provided civil engineering design services for the revitalization of 4,800 linear feet of the Central Avenue Business Corridor. Designed and implemented streetscape concept plans, engineering drawings, and bid documents to complement the existing historical elements. Douglas Harrison Redevelopment, Newark, NJ - Project Manager for the design, permitting, and construction oversight of the outdated Douglas Harrison Homes in Newark’s Central Ward. The project proposes to construct “brownstone” style family rental units, a mid-rise senior building, and two public parks to be dedicated to Green Acres. Baxter Park South, Newark, NJ - Project Manager for the redevelopment of Baxter Terrace, a recently demolished low-income housing development owned and operated by the Newark Housing Authority. This project consists of the design, permitting, and construction administration of two 4-story mixed-use buildings with a total of 90 residential units, and ground floor retail space. Baxter Park South will be the first of many redevelopment projects in the City of Newark’s Broad Street Station Redevelopment Area. Montgomery Heights, Newark, NJ - Project Manager

File revisions (1)