Page 34

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy 127 ZOOM OPERATOR: Again, I’m just seeing -- Art Butensky, can you un-mute? Okay. I am seeing none. CHAIRMAN BAGOFF: Okay. Well, seeing none, give Mr. Butensky one more try. Mr. Butensky, can you un-mute, Sir? MS. McGOVERN: I think he’s gone. ZOOM OPERATOR: Yeah. He’s gone. CHAIRMAN BAGOFF: He’s gone? Okay. We’re going to close this portion of the meeting. Mr. Schkolnick, you’re up. MR. SCHKOLNICK: Thank you, Mr. Chairman. Could -- could we take judicial notice that the United States has defeated Bosnia 2 to 0 in the World Cup? CHAIRMAN BAGOFF: The chair takes notice. MR. SCHKOLNICK: We’ll -- we’ll get started, I guess. Chairman, what time do you want to go to? CHAIRMAN BAGOFF: 10:50. MR. SCHKOLNICK: We’ll try to get started, I guess. CHAIRMAN BAGOFF: Okay. MR. SCHKOLNICK: Call John Cote. MR. COTE: Good evening. CHAIRMAN BAGOFF: Good evening. MS. McGOVERN: Okay, Mr. Cote. Please -- MR. COTE: I have previous -- MS. McGOVERN: Please raise your right hand.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy 128 MR. COTE: All right. Yeah. MS. McGOVERN: Do you swear or affirm -- MR. COTE: I was sworn in last time. I don’t know if you want to keep that or not. MS. McGOVERN: Oh. I didn’t realize that. Dr. Bagoff, do you want him to be re-sworn or -- CHAIRMAN BAGOFF: No. MS. McGOVERN: -- just remind him that he’s under oath? CHAIRMAN BAGOFF: Do you -- you understand you’re still under oath, Sir, and your license is still good in the state of New Jersey. Is that correct? MR. COTE: Yes. That is correct. CHAIRMAN BAGOFF: Okay. Good enough for me. Go for it. MR. SCHKOLNICK: Thank you. MR. COTE: So what I’m going to do is we’re going to just go through the plan set, the site civil plan set that was delivered in concert with what both -- both Ms. Cancellaro talked about as well as Mr. Pehnke in their testimony. And I’ll tie back into -- MR. SCHKOLNICK: Okay. John, I’m sorry. I just want the board to confirm that you were qualified as an expert and we don’t have an issue with that. I apologize. MR. COTE: Sure.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 129 MR. SCHKOLNICK: Chairman, we did qualify him. I want to make sure that’s recognized for the record so we don’t -- CHAIRMAN BAGOFF: Yes. Yes. Everything that we did last time still follows

Page 34

- Direct 129 MR. SCHKOLNICK: Chairman, we did qualify him. I want to make sure that’s recognized for the record so we don’t -- CHAIRMAN BAGOFF: Yes. Yes. Everything that we did last time still follows through. MR. SCHKOLNICK: Okay. I just don’t want to have an issue with that. I’m sorry. DIRECT EXAMINATION BY MR. SCHKOLNICK: Q Okay. Thank you, John. A All right. So what I’m going to do is I’ll share my screen and we’ll go through the -- the plans here. Q John, if you’d call out the sheet number and the last revision date. A Sure. So this is the first drawing we put up last session, last hearing, and it’s exhibit A-1 now in terms of the -- the reference and it’s drawing lab -- excuse me, labeled “Project Aerial Map”. Exhibit EX-05 is the drawing number on it and it’s dated June 1st, 2026. And that’s consistent with what we’ve presented previously. And this is, again, just for orientation. Looking at the site with the north to the right of the site. The location of the area in question for the bulk of our improvements is located again between Laurel and Eagle Rock Avenue and we’re going to spend -- I’ll go through my components of the on-site related1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 130 improvements. So I’m going to switch now to the site plan set proper, and when we talk about the site, we talk about the east and west side of the site in terms of the way the sheets are set up. Orientation-wise, the Laurel Ave and Eagle Rock intersection is on the westerly sheet and then Oval and the -- the driveway is on the eastern side -- eastern side. So, the westerly portion of the site consists of a number of improvements, starting with the addition of a stormwater basin located along -- at the intersection of Laurel and Eagle Rock Avenue. That basin will serve multiple purposes for the -- certain terms of both water quantity, water quality, treatment for the site. As you progress -- as you weigh in -- into the site through the entrance off of Laurel, as you come up to towards the porte cochere to the main entrance to the building, we’re looking to propose an additional parking area adjacent to the existing parking and I’m going to refer to this parking as the upper level parking because that will be in reference to what we’ll see on the next drawing. And in that area, we’re proposing 39 parking spaces, and they’ll be

Page 34

m going to refer to this parking as the upper level parking because that will be in reference to what we’ll see on the next drawing. And in that area, we’re proposing 39 parking spaces, and they’ll be integrated to connect into the existing parking lot that’s there today as an add-on basically pushing, more or less, the extent of the parking to the north on the site.

Page 35

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 131 I’ll refer to more content relative to the design of each of the elements, but basically, we’re providing within that -- the 39 parking spaces in this area, two EV parking spaces. And I’ll just touch on really quick, I’m going to kind of divert to some comments that were made from the engineers’ and planners’ letters, and in particular, one of the EV spaces here will require to be an ADA EV -- EV space and we’re going to provide that EV ADA space on the existing EV -- excuse me, existing ADA space on the site. So we’ll accommodate that requirement for one EV being an ADA space on the existing handicap space or ADA space on the site today. So, looking at the orientation of the left-hand side, you’ll see -- the western side, you’ll see the combination of the -- the basin and the parking lot. There are representations of where the walls are, and I’ll talk a little bit more about that when we get into the design -- elements. And then there’s the -- the widening of Eagle Rock Ave. And part of that is to grade Eagle Rock Ave in accordance with Mr. Pehnke’s testimony to level off the area adjacent to the roadway. To provide that level area, we’re proposing a wall along the frontage, and that wall will run the length of the Eagle Rock Ave from Laurel Ave into the new intersection being1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 132 proposed. I’m going to now switch to the easterly sheet site plan, and I apologize. I will state the sheet numbers. The first -- and do you want to tell me if you want to make the set A-2, or do you want to make -- Q No. No, no, no. A -- the set -- each one individually will be -- individual. Okay. So we’re going to -- Q We’re -- we’re not re-marking, John. These are already -- A Understood. Q These are in the record. A These are in the record. Okay. I just want to make sure. All right. So then the easterly partial site plan is now what I have on the screen, and the easterly partial shows the intersection that we’ve been referring to in the earlier testimony by Mr. Pehnke, Eagle Rock Ave. And it also shows the on-site improvements relative to the new egress drive. The new egress drive starts at the upper level parking lot and progresses down to the new intersection with Oval. That roadway will be a 24-foot

Page 35

on-site improvements relative to the new egress drive. The new egress drive starts at the upper level parking lot and progresses down to the new intersection with Oval. That roadway will be a 24-foot wide connection into there, providing the two lanes, a left and a right and a through movement exiting out onto Eagle Rock Avenue. In doing that, there’s an underlying arching area1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 133 that I’ll call the lower level that we’re modifying. In reconfiguring that parking lot, we’re basically creating a 64-space parking lot in that lower level that now connects to the new egress drive and maintains the existing connection to the upper level parking lot that’s along the -- the south center portion of that lower lot. That lot will also provide -- there’s an area where we’re providing water quality measures, porous pavement along a northern portion of that, and that’ll tie into some of our water quality measures that we’re providing for the site. One note here for the purpose of the variance, we do have a location where fence is locat -- guide rails located within less than five feet of a parking space and the reason for that configuration is based upon the previously-approved modular structure that was built there to provide a separation between the parking spaces and the pedestrian movements to that building. So that’s one element of a variance that we’re asking for. Looking at the site in the -- in that northern -- I’m sorry, the eastern edge on the northern side, we are proposing another detention basin. This detention basin, again, similar to the one that’s at the corner of Eagle Rock and Laurel, will be to treat -- for both1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 134 water quality and water quantity for the purpose of balancing out the stormwater and achieving compliance with the stormwater regulations. One item to point out relative to the site plan, the combination of these two sheets is that the existing site today has 256 parking spaces. The prior variance that was granted for this site was actually granted at 252, but a physical count of the spaces out there yielded 256. Based upon the 256, we’re adding an additional 36 spaces and I’m going to qualify those 36 spaces be -- it’s 32 physical spaces that we’re adding in total, the net between

Page 35

paces out there yielded 256. Based upon the 256, we’re adding an additional 36 spaces and I’m going to qualify those 36 spaces be -- it’s 32 physical spaces that we’re adding in total, the net between the revisions of the new parking lot as well as the lower -- reconfiguration of the lower lot and four of those total spaces are what are referred to as the EV credits so that for each EV space, we have a credit of one additional parking space counting towards our parking compliance. That is a part of that calculation. So there will be physically, for the record, 288 spaces built, total, and completed with the additional spaces, and the additional four towards the parking count that’s part of the variance request here to get us to 292 are those EV credit spaces. So then -- Q When you -- John, when you say variance request, there’s already a deficit.

Page 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 135 A Correct. Q We’re reducing -- A Reducing. Yes. Q We’re reducing the existing deficit. A That is correct. My -- yeah. So you can qualify it as that these increase in spaces reduces the current relief that you granted this site previously so that we’re going from the 252 spaces previously approved in the -- in a prior site plan variance against the 700 that the ordinance would call for to 292 spaces, and therefore reducing the relief previously granted on the site. So, these layouts of the roadways with the standard parking spaces, the 24-foot drive aisle, the configuration I -- I’ve referred to in terms of the connection, what we’ve done is we’ve taken for emergency vehicles, I’m going to switch now to our traffic circulation, or excuse me, our fire truck circulation plan, and routed those through these new features added to the site to show that they can maneuver and emergency vehicles can access these locations and progress through them. So this is the westerly side, showing through the new parking facility based upon the West Orange ladder truck that’s been given to us dimensionally for this particular support of this area. And then on the1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 136 easterly half of the site, the same scenario there. We show now the fire truck maneuvering both through the existing parking lot also making its way through the proposed reconfiguration of the lower lot as well as using the egress scenario to access -- to exit out onto Eagle Rock Avenue, both in an easterly and a westerly fashion. So moving on to the way the site is graded for the purpose of the -- the layout, I refer to the upper level and lower level parking lot because of the changing grades as we make our way along, and the changing grades on this site are significant. There are a number of locations where we’re overcoming the existing conditions, the grades, and in -- part of the driving factor between where we’ve put walls on this site and the reason for the walls are to help minimize the number of trees removed. And I’m going to get to the testimony about the number of trees to be removed and the number of trees that are going to be replaced as a function of the development. But basically, just to give a quick perspective on it, if Eagle Rock Avenue

Page 36

ut the number of trees to be removed and the number of trees that are going to be replaced as a function of the development. But basically, just to give a quick perspective on it, if Eagle Rock Avenue is sitting at let’s say an area where I’m pointing to at elevation 547, the upper parking lot area here is at 566. And we’re making the stormwater and the -- and the grading associated with this to control all the runoff from the site as a1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 137 combination of these small-scale basins I referred to earlier, one in the northwest corner and one at the east end of the site, northeast end of the site, and we’re also providing a swale at the top of the wall to direct water rather than sheet-flowing out onto Eagle Rock Avenue, to progress into the system and make its way into a controlled drainage conveyance system, the -- the piping network that conveys this, flows from the site. One of the things we did towards the discussion about the safety associated with Eagle Rock Avenue is we also evaluated the stormwater on Eagle Rock Avenue and found the existing system to be deficient and we’re upgrading that system along Eagle Rock Avenue to accommodate the flows that -- and the deficient scenario where now can get a suitable system installed associated with these improvements. So that’ll improve the drainage aspects of Eagle Rock Ave, controlling the sheet flow that goes uncontrolled today as well as doing the volume reduction -- the -- excuse me, the -- the flow reductions that we need to do to be compliant with the stormwater regulations. Looking at the second sheet, on the east side of the site, and again, the upper parking lot configuration, just to kind of give people a sense of1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 138 where we are elevation-wise, this upper lot is, say, 560, elevation 560, 558 and along that range at the -- the top end of it. Then we make our way to 564, making our way up to the top of what is the new exit driveway. And that exit driveway at 564 runs down the driveway until we get down to Eagle Rock Avenue, which is roughly around elevation 538. So from 564 to 538, one of the elements needed for that is we needed to make the driveway at eight and a half percent to support that move -- that transition and grade down. And in addition

Page 36

ation 538. So from 564 to 538, one of the elements needed for that is we needed to make the driveway at eight and a half percent to support that move -- that transition and grade down. And in addition to that transition of the eight and a half percent to get down to Eagle Rock Ave, we also had to utilize walls to be able to support those changes in grades to maintain the upper level parking lot, the grades adjacent to going -- making your way down the hill to Eagle Rock Avenue, and also to allow for a stormwater basin to be built on the site. So one of the variance requests in this application is for the height of the walls. And the 21.5-foot height of the wall occurs where we have this lower level basin, you know, basically at a level that is compatible with getting it out to the street for street grade and dealing with the Eagle Rock discharges and supporting the upper level parking, and that transition occurs at this north end.

Page 37

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 139 The walls along Eagle Rock Avenue from the pull- back of the grades that Mr. Pehnke referred to earlier create an approximate eight to nine-foot high wall that’ll be along Eagle Rock Avenue from the corner of Laurel and Eagle Rock to the new access drive, or, excuse me, new egress drive. So from a grading point of view, you know, we had the existing driveways that are -- that are out there today that was referred to multiple times as the acute angle driveway. That is being removed in its entirety. Those slope conditions will be gone relative to that, but we are keeping the 10-and-a-half percent existing drive that we’re keeping, tying in the lower level and the upper level parking lot. So the variance also speaks to the 10-and-a-half percent that is on the driveway that’s existing but being slightly modified but not steeper to keep the connection between the two drive -- two parking lots. Going from the -- you know, the area associated with the -- both the detention basins, handling both the parking lots and the new driveway, I’ll look at the -- I’ll flip now to the drainage plan, the bio- retention -- small-scale bio-retention basin basically is going to serve that water quality and water quantity reduction. We are tying in drains that were previously just sheet-flowed out from the site and connecting them1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Direct 140 -- and the idea behind this is basically to get everything into the pipes as opposed to having it sheet-flow over Eagle Rock Avenue and -- which would help relative to potential icing conditions and things along that lines in terms of safety on Eagle Rock Ave. When I look at the eastern side, it’s a similar scenario. You have another small-scale bio-retention basin. We are going to be planting one basin with woody vegetation; that’ll provide part of the discussion about what we’re doing for landscaping and I’ll get into that in a little bit, but the idea behind these is that the bio-retention provides that water quality in concert with the porous pavement that’s proposed in the parking lot. And again, all of these measures, the retention basins, the porous pavement, and -- and everything else that’s been tied together is to achieve compliance with your current stormwater regulations. So then